Surat Chennai Expressway | Full Route, Progress Info, Cost & More

blog

The Surat Chennai Expressway is one of India’s most important infrastructure projects under the Bharatmala Pariyojna Phase 2, connecting the industrial city of Surat in Gujarat to Chennai in Tamil Nadu. This upcoming expressway aims to significantly reduce travel time, improve trade flow, boost real estate, and promote regional development across six Indian states.


Main Features of the Surat Chennai Expressway

Here are the major highlights of the project in a tabular format:

Project Detail Description
Total Length 1,271 km
Project Cost Estimate ₹45,000 to ₹50,000 crore
Estimated Completion 2027
Type of Construction Mix of Greenfield & Brownfield
Number of Lanes 6-lane expressway
Design Speed 120 km/h
Project Model Hybrid Annuity Model (HAM)
States Covered Gujarat, Maharashtra, Karnataka, Telangana, Andhra Pradesh, Tamil Nadu

Surat Chennai Expressway Route and Connectivity

The Surat Chennai Expressway will travel through a total of six states:

  • Gujarat

  • Maharashtra

  • Karnataka

  • Telangana

  • Andhra Pradesh

  • Tamil Nadu

Key cities along the route include Nashik, Ahmednagar, Solapur, Kalaburagi, Kurnool, Kadapa, and Tirupati.

The corridor avoids major congested urban zones like Mumbai, Pune, Hyderabad, and Bengaluru, offering faster connectivity for freight and passengers across India’s western, southern, and central regions.


Travel Time and Distance Reduction

One of the biggest advantages of the project is its ability to shorten the travel time and distance between Surat and Chennai.

Travel Metric Current After Expressway
Distance 1,570 km 1,271 km
Travel Time 35 hours 28 hours
Time Saved       — 6-7 hours

Division of the Surat Chennai Expressway

The expressway is divided into two main corridors:

1. Surat – Solapur Economic Corridor

Length: Approx. 564 km

  • Covers Gujarat and Maharashtra

  • Includes a mix of greenfield and brownfield segments

  • Nashik to Ahmednagar is part of the greenfield development

2. Solapur – Chennai Economic Corridor

Length: Approx. 707 km

  • Covers Maharashtra, Karnataka, Telangana, Andhra Pradesh, Tamil Nadu

  • Major greenfield stretch from Akkalkot (MH) to Mahabubnagar (TS)


Package-Wise Construction Progress

The entire corridor is being built in packages to manage construction efficiently. Below is the construction status of a few major packages:

Surat to Solapur Section

Package No From – To Status
1 Shahapur – Khamgaon Tender Cancelled
4 Ambegaon – Chehedi Khurd Under Bidding
5 Chehedi Khurd – Khandalwadi Bidding In Progress
14 Hasapur – Badada Under Construction

Solapur to Chennai Section

Maharashtra & Karnataka Stretch

Package No From – To Status
1 Akkalkot – Baddal (MH-KA border) Construction Started
4 Baswantpur – Singnodi Nearing Completion (June 2025)

Telangana Stretch

Package No From – To Length
1 Singnodi – Julekal 39.3 km
2 Julekal – Kurnool (NH 40) 38.2 km

Andhra Pradesh Stretch

Package No From – To Length
1 Kadapa – Chinna Orampadu (NH 716) 64.2 km
2 Chinna Orampadu – Tirupati Airport (NH 565) 57.7 km

Timeline of the Surat Chennai Expressway

Year/Month Event Description
March 2021 Project announced by Ministry of Road Transport & Highways
February 2022 Bidding process for various packages initiated
January 2023 Foundation stone laid by Prime Minister Narendra Modi
June 2025 Early opening expected for parts of Karnataka
2027 Target year for full project completion

Economic and Development Impact - Surat Chennai Expressway

1. Boost to Trade and Industry

The expressway is part of a larger effort to improve industrial corridors across India. It will directly connect key manufacturing hubs in Gujarat, Maharashtra, and Tamil Nadu, promoting smoother transport of goods and raw materials.

2. Job Creation

Thousands of jobs will be created during the construction and operational phases ranging from construction workers and engineers to service providers along the corridor.

3. Tourism Development

New access points to Western Ghats, Tirupati, and Andhra Pradesh interiors will help boost tourism, especially religious and eco-tourism.

4. Environmental Planning

The expressway design includes plantation of trees and shrubs along the route to minimize the environmental impact and restore green cover, especially in ecologically sensitive zones like Nashik and the Western Ghats.


Real Estate Opportunities along the Expressway

The expressway will unlock massive real estate potential:

  • Industrial Real Estate: New logistics parks, warehouses, and factories are expected along the corridor.

  • Commercial Real Estate: Highway rest stops, fuel stations, motels, and retail outlets will develop along the route.

  • Residential Development: As the region grows, housing demand will rise, creating affordable and premium residential zones.

  • Land Value Appreciation: Land along and near the expressway alignment is expected to appreciate steadily over the next 5–10 years.


Final Thoughts - Surat Chennai Expressway

The Surat Chennai Expressway is not just a new road; it’s a strategic infrastructure development that will play a key role in unifying South and West India through fast, seamless connectivity. With over 1,270 kilometers of highway under construction, the expressway is set to transform trade, boost real estate, and promote economic growth across six states. With multiple packages already under construction and some nearing completion, the expressway is moving towards its 2027 deadline at a steady pace.